Poor Richard'S Almanack
Shipping
| Cart Value (USD) |
Greater than $55 |
$35-$54.99 | $25-$34.99 | $15-$24.99 | Less than $14.99 |
|---|---|---|---|---|---|
| Shipping Rates(USD) |
FREE | $5.97 | $9.97 | $11.97 | $16.97 |
Poor Richard's Almanack
Description & Features:
A faithful reproduction of the original Peter Pauper Press edition of Poor Richard's Almanack, circa 1950, the current version contains the same colorful woodcuts ('quaint Cuts by and Unknown Hand') and 18th century design of the original. Printed in hard cover on heavyweight paper stock, this is a great addition to any Franklin fan's collection. Hundreds of delightful aphorisms, carefully selected from many issues of Franklin's popular 18th-century publication: Early to bed and early to rise, makes a man healthy, wealthy, and wise, & Love your Neighbor yet don't pull down your Hedge, & He that lies down with Dogs, shall rise up with fleas; and many more.
Dimensions : 15.2 x 1.3 x 23.5 cm
ISBN: 9780880889186
Number of Pages: 77
Publication Date: 1983
Legal Disclaimer: Product images are for illustrative purposes only. Images/packaging/ labels may vary from time to time due to changes made by the manufacturer's manufacturing batch and location.


